First Release

Year: LXII.
Zagreb, 02 March 2026
GRAD-2025-1-2/4

ISSN 1334-0557

COMPLETED CONSTRUCTION WORKS AND ORDERS, BUSINESS ENTITIES EMPLOYING 20 OR MORE PERSONS, FOURTH QUARTER OF 2025

 

The value of new orders:

- increased by 10.2% in the fourth quarter of 2025, as compared to the same period of 2024

- increased by 8.9% in the period from January to December 2025, as compared to the same period of 2024.

 

The value of construction works done with own workers:

- increased by 6.3% in the fourth quarter of 2025, as compared to the same period of 2024

- increased by 7.0% in the period from January to December 2025, as compared to the same period of 2024.

 

1 INDICES OF CONSTRUCTION WORKS ON TERRITORY OF REPUBLIC OF CROATIA

    Indices
X – XII 2025
VII – IX 2025
X – XII 2025
X – XII 2024
I – XII 2025
I – XII 2024
X – XII 2025
Ø 2024
Value of new orders 116,2 110,2 108,9 124,9
Value of construction works done with own workers 116,1 106,3 107,0 124,9

2 NEW ORDERS OF CONSTRUCTION WORKS ON TERRITORY OF REPUBLIC OF CROATIA

 Thousand euro

  Value of new orders Value of new orders, by types of constructions
On buildings On civil engineering works
I – XII 2025 6 674 568 3 819 178 2 855 390
I – III 2025 1 454 791 800 665 654 126
IV – VI 2025 1 658 603 957 447 701 156
VII – IX 2025 1 647 494 987 312 660 182
X – XII 2025 1 913 680 1 073 754 839 926

3 VALUE OF CONSTRUCTION WORKS DONE AND BUILDING MATERIAL, COMPLETE UNITS AND STRUCTURES AND PROPULSION MATERIAL USED

Thousand euro

  Value of construction works done Value of building material, complete units and structures and propulsion material used
Total Works done with own workers Works done with sub-contractors
I – XII 2025 7 485 273 5 226 221 2 259 052 1 345 079
I – III 2025 1 587 526 1 103 304 484 222 290 942
IV – VI 2025 1 889 753 1 284 029 605 724 338 075
VII – IX 2025 1 923 592 1 313 935 609 657 324 983
X – XII 2025 2 084 402 1 524 953 559 449 391 079

4 VALUE OF CONSTRUCTION WORKS DONE WITH OWN WORKERS, BY TYPES OF CONSTRUCTIONS AND WORKS

   Total, thousand euro Composition of value of construction works done, by types of works, %
Total New constructions Other works1)
X – XII 2025          
Total 1 524 953 100,0 65,7 34,3
On buildings 826 686 54,2 39,1 15,1
On civil engineering works 698 267 45,8 26,6 19,2
I – XII 2025           
Total 5 226 221 100,0 65,5 34,5
On buildings 2 888 274 55,3 40,2 15,1
On civil engineering works 2 337 947 44,7 25,3 19,4

1) Reconstructions, maintenance and repair works of existing buildings.

G-1 VALUE OF CONSTRUCTION WORKS DONE WITH OWN WORKERS, BY TYPES OF CONSTRUCTIONS AND WORKS, JANUARY – DECEMBER 2025

G-2 COMPOSITION OF VALUE OF CONSTRUCTION WORKS DONE WITH OWN WORKERS, BY TYPES OF CONSTRUCTIONS, JANUARY – DECEMBER 2025

 

NOTES ON METHODOLOGY

Sources and methods of data collection

Presented data on construction are collected through reporting method on forms entitled the Monthly Report on Construction (GRAĐ-21/M form) and the Quarterly Report on Construction (GRAĐ-21/3M form).

Coverage and comparability

Data for the Monthly Report and the Quarterly Report on construction are collected from business entities (legal entities and tradesmen) and parts thereof employing 20 or more persons classified according to the National Classification of Activities, 2025 version (NN, No. 47/24) into section F Construction in the Statistical Business Register.

They refer to all construction works (new constructions and reconstructions, maintenance and repair works on existing constructions) done on the territory of the Republic of Croatia.

Constructions and works are classified according to the Classification of Types of Constructions.

Definitions

The value of construction works is presented in current prices and includes works actually done during the reporting period, irrespective of whether they are paid for or not.

The value of construction works done includes the value of work, building material, complete units and structures, propulsion material and electricity, expenses of construction machinery usage and equipment and other expenses related to the work in question.

The value of construction works done excludes value added tax, purchase costs of the land, project costs, surveying of land and supervising of services.

The value of new orders is the total value of the contracts made in a reference month with ordering parties. An order is considered to be made on the day when a contract is signed between the ordering party and the contractor.

New orders also include works done by a constructor on own account and for sale (e.g. business premises and dwellings). Referring to constructions on own account and for sale, it is assumed that the order is placed on the day when works have actually started and that the presumed value of works is included.

More detailed notes on methodology of these surveys are published on the web site of the Croatian Bureau of Statistics.

 

Abbreviations

NN   Narodne novine, official gazette of the Republic of Croatia

 

Published by the Croatian Bureau of Statistics, Zagreb, Ilica 3, P. O. B. 80
Phone: (+385 1) 48 06 111
Press corner: press@dzs.hr

Persons responsible:
Milenka Primorac Čačić, Director of Business Statistics Directorate
Lidija Brković, Acting Director General

Prepared by:
Srećko Palej and Mirjana Mikulić

USERS ARE KINDLY REQUESTED TO STATE THE SOURCE.

Customer Relations and Data Protection Department

Information and user requests
Phone: (+385 1) 48 06 138, 48 06 154, 48 06 115
E-mail: stat.info@dzs.hr

Subscription
Phone: (+385 1) 21 00 455
E-mail: prodaja@dzs.hr

Postavke pristupačnosti